Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Construction Sites

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
(Redirected from Construction)
Jump to navigation Jump to search

There have been many construction sites in Club Penguin. They usually occur before parties or when re-constructing or building a new room. During this time, penguins may drill with hard hats and mining helmets more frequently, and there are signs that say "PENGUINS AT WORK" or something similar.

The Construction Power Card.

Construction Utilities

Items

These or similar items are usually seen at construction sites, weather they're being worn by penguins or they're just laying around the site.

Other

Major construction events

Construction of The Stage

The construction of The Stage occurred in late 2007. What makes the project major is that the entire building was built from scratch.

Earthquake

See main article: Earthquake

The Earthquake was a Natural Disaster that occurred in June 2008, and was caused by the actions of Herbert P. Bear and his Earthquake Driller. It also is the main reason for PSA Secret Mission 7: Mysterious Tremors.

Dig Out the Dojo

See main article: Dig Out the Dojo

Dig Out the Dojo was a large construction project in November 2008. Before then, the Dojo had been covered in snow, so you couldn't see the exterior. However, The Great Storm of 2008 damaged the roof of the Dojo and lead to the exterior being cleared of snow, and the roof being repaired. After construction was complete the Dojo Grand Re-Opening occurred and Card-Jitsu was released.

Other Dojo projects

See related articles: Sensei's Scavenger Hunt and Water Hunt.

There have been construction projects at the dojo at times other than Dig Out the Dojo. Construction usually happens whenever a new elemental dojo is built.

Festival of Flight

See main articles: Water Party 2007, Festival of Flight

Although the Water Party 2007 and Festival of Flight were parties, their main purpose was to fix the windows in the Cave, which threatened to break if left unattended.


Pet Shop renovation

The Pet Shop renovation occurred in March 2011, and was directed PH. It was renovated to make it more fun and interactive for the puffles. It was released along with the new design for the Puffle Card and the game Puffle Launch.

Everyday Phoning Facility reconstruction

See related articles: Popcorn Explosion, Battle of Doom, Operation: Blackout, EPF Reconstruction‎

The Everyday Phoning Facility building has had to be reconstructed/repaired three times.

Gallery of construction

Construction sites before parties

Click to view this gallery

Trivia

  • There is also a Card Jitsu power card featuring a construction site.